Unités exécutées

  • Grubbing & Clearing [163.460 m2]
  • Quarry excavation [100.103 m3]
  • Enbankment shaping from borrow pits [160.000 m3]
  • Foundation layer [84.940 m3]
  • Base layer stabilized with 3% cement [77.320 m3]
  • Hot Bituminous mix [269.800 m3]
  • Monolayer threatment [90.000 m2]
  • Rock wall placement [3.456 m3]
  • Reinforced concrete on site [3.196 m3]
  • Kerbs on the road [21.500 m.l.]
  • Safety metal barrier [500 m.l.]
  • Horizontal signaling continuous lines [9.750 m.l.]
  • Horizontal signaling discontinuous lines [8.788 m.l.]
  • Horizontal signaling lateral bands [42.667 m.l.]
  • Vertical signals [208 units]
  • Population water wells [3 units]

Description du travail

The Project consists in the construction of a 37 km road between Khombole, Touba Toul and Tivaoune, 70km to the North of Dakar. The road measures 10,2m wide made up of two single carriageways 3,6m wide each with 1,5m hard shoulders. Road surface is made up of a 25 cm thick stabilized layer with cement on site together with a 5 cm conglomerate layer. 13 transversal drainage works have been carried out with concrete frames made on site with the following dimensions: 1x1, 1x2 y 4x2. A 10 km long, 9 mtr wide and 15 cm deep laterite track has been constructed in order to intercommunicate nearby villages. Additionally, 3 water wells have been drilled and constructed to supply water to nearby villages, 170m, 270m and 330m in depth respectively. With regards to the Tivaoune through road, the roadway has been widened to four lanes measuring 3.6 meters wide with 1.5 meter wide hard shoulders. The project includes the placing of 100 street lights.

Informations générales

  • Situation: Senegal
  • Type: Autoroute
  • Client: AGEROUTE
  • Date de début: Nov 2021
  • Date de fin: Sep 2013
  • Montant facturé: 12.866.483,97 €